This is a section of the Work Flow Loading Course
Contained within each of the Work Load Assessment Modules are six video clips, from cycle 1 to cycle 6
Each cycle has three segments of work performed at different work paces. Towards the end of each segment, a countdown warning will alert you to a change of pace. The stopwatch must be activated instantly you observe the X.
This elapsed time, together with your pace rating assessment are to be entered onto your Load Sequence Study Sheet at the appropriate cycle number.
When all six cycles have been entered onto the Load Sequence Study Sheet, the Basic Time can be calculated and the Work Load declared